The Green Bay Shipyard District is undergoing redevelopment into a mixed‑use destination for recreation, tourism and community events. Phase 1 of construction finished in 2024 and introduced new public spaces that reconnect residents with the waterfront. The project revitalizes a former industrial site and transforms it into a welcoming community space.
Visitors now enjoy trails, docks and gathering areas designed to enhance daily life. Residents gain safe, attractive places to gather and new opportunities for outdoor recreation. Along the Fox River, the wide multi‑use path offers unobstructed views of the water and the city's skyline.
The redevelopment called for railing systems that ensure safety, durability and visual appeal in a busy outdoor setting. The site included a multiuse path, floating dock, fishing pier and accessible kayak launch, all requiring reliable protection for visitors. The railing systems had to withstand harsh waterfront conditions while minimizing maintenance demands, making long‑term performance just as important as initial installation.
Wagner provided a range of railing systems tailored to the site’s diverse needs:
Waterfront Cable Railings:
Illuminated Steps and Ramp Railings:
Secondary Waterfront Railings with Bantam™ Integration:
Wagnerail™ System for Elevated Resting Area:
Wagner’s railing systems made a clear difference in the Green Bay Shipyard redevelopment. Cable railing and illuminated paths provide life safety near the water and encourage recreation along the waterfront. Lumenpod 16 and Bantam fixtures add a warm, ambient glow that invites visitors to enjoy the space into the evening.
Stainless steel railings deliver durability in harsh waterfront conditions and require minimal maintenance. Together, these installations strengthen the Shipyard’s vision of a welcoming and accessible public space where residents and visitors can gather, connect and experience the waterfront.
Justin Pupp, a project manager for the Green Bay Shipyard Phase 1 redevelopment, noted:
“The installation went really smoothly overall, and Wagner’s products and systems played a key role in the success of the project. The team did a great job ensuring that everything was manufactured efficiently and met the project requirements. There were no major issues during the process, and the systems were well‑received by everyone involved. The quality and reliability of the products really made a difference in ensuring the installation stayed on track.”
The Green Bay Shipyard’s Phase I redevelopment demonstrates how Wagner’s railing systems can enhance both safety and experience in public spaces. Through design and reliable performance, Wagner transformed a historic industrial site into a thriving waterfront destination. Today, residents and visitors gather, explore and enjoy the riverfront in a space that feels both secure and welcoming.